EXPLORE THE FEATURES
ADVANCE MODELS
Last ask him cold feel met spot shy want. Children me laughing we prospect answered followed. At it went is song. Last ask him cold feel met spot.
EXPLORE THE FEATURES
MODERN CITYSCAPE
Last ask him cold feel met spot shy want. Children me laughing we prospect answered followed. At it went is song. Last ask him cold feel met spot.
WHAT WE DO
Building Everything That You Needed.
General Construction
A sequential design-bid-build process, typically delivered under a lump-sum or cost-reimbursable contract, is the traditional method of project delivery, especially
Design-build
Clients select a design-build arrangement when they want to work with one contract entity, instead of several contractors and consultants.
Sustainable Construction
Sustainable construction goes beyond just following construction documents. By understanding the principles of sustainability, SCEPL can assist you with maximizing
ABOUT OUR COMPANY
We Building Everything That You Needed.
We have intentionally never developed a stylistic formula for our work, which is why our projects never quite look or feel the same. Each of our spaces is the result of our ability to listen. As the general contractor, we first create the highest level of trust and integrity with our clients. We value our role in the success of your project.
- Intentional development authority
- Stylistic formula method
- Royal ability to listen design
- Stylistic formula method
- Royal ability to listen design
- Intentional development authority
- Royal ability to listen design
- Intentional development authority
- Stylistic formula method
Building better products
Words which don't look even believable. If you are going to use a of you need to be sure there isn't anything.
Effective Industrial Team Work
Last ask him cold feel met spot shy want. Children me laughing we prospect. Me we offending If you are going to use a of you need to be sure there isn't anything.
-
86k
-
100%
Our Construction is
Built on Culture
Our work is only good as our people. Meet the team who makes our projects successful.
Start ConsultingMeet Our Experts
Team Members
While mirth large of on front. Ye he greater related adapted proceed entered an. Through it examine express promise no. Past add size game cold girl off how old
Swapnil Ambardekar
Founder & ChairmanSwapnil Ambardekar
The founder and Chairman of Sidhcon and all its group industries except Sidhcon I.M.Patel-JV.After joining Sidhcon Group in April 2004
J.S. Mehta
Executive Vice ChairmanJ.S. Mehta
Mr.J.S.Mehta was appointed to our Board of Directors in August 2003.His responsibilities include executing our business strategy and monitoring the
Blog
Latest News
While mirth large of on front. Ye he greater related adapted proceed entered an. Through it examine express promise no. Past add size game cold girl off how old
CONSTRUCTION OF SBI NEPAL TRAINING CENTRE
CONSTRUCTION OF SBI NEPAL TRAINING CENTRE AT KATHMANDU (NEPAL), ON DESIGN, ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC)
Read MoreCONSTRUCTION OF SINGLE LINE BG TUNNEL
CONSTRUCTION OF SINGLE LINE BG TUNNEL T-3 (2108m) , T-5 (2170m) INCLUDING DESIGN /LAYING OF TRACK
Read MoreUnique Productivity
SCEPL provides expertise in industries and specialised construction like factories..
Read More